Question

A graphical representation that shows the risk of: (1) accepting bad lots and (2) rejecting good lots is called the:

A. indifference curve.

B. operating characteristic curve.

C. sampling plan.

D. inspection curve.

E. operating inspection plan.

Answer

This answer is hidden. It contains 62 characters.