Question

A limitation of the internal rate of return method is:
A. Failure to measure time value of money.
B. Failure to measure results as a percent.
C. Failure to consider the payback period.
D. Failure to reflect changes in risk levels over project life.
E. Failure to compare dissimilar projects.