A Methods and Measurements Analyst needs to develop a time standard for a certain task. The task involves use of a ruler, square, and portable electric saw to mark and cut the "notch" in a rafter (a standard carpentry task of home construction). In a preliminary study, he observed one of his workers performing this task five times. The observations were made in an air-conditioned, well-lit training facility, at ground level, with all tools and equipment clean and readily available.


Observation: 1 2 3 4 5
Task time (seconds): 82 74 80 83 76

a. What is the actual average time for this task?

b. What is the normal time for this task if the employee worked at a 20% faster pace than is typical for adequately trained workers?

c. What is standard time for this task if allowances sum to 14%?

d. If the analyst then thought more carefully about his experiment and decided that the allowances needed to be increased to match the real (outside, not air-conditioned) work environment, and that the proper allowance was not 14% but 20%, what is the revised standard time?

Answer

This answer is hidden. It contains 180 characters.