Question

A production line is to be designed for a job with three tasks. The task times are .4 minutes, 1.2 minutes, and .5 minutes. The maximum cycle time in minutes is:

A. .3.

B. .7.

C. 1.4.

D. 2.1.

E. .8.

Answer

This answer is hidden. It contains 31 characters.