Question

A requirement of two-resource sequencing rule is that:

a. all jobs must begin at the same time.

b. each job must be processed first on the first resource and then on the second.

c. a maximum of two jobs can be processed at a time on each resource.

d. total processing time must be minimized.

Answer

This answer is hidden. It contains 1 characters.