A task involves positioning two metal parts with a rubber gasket sandwiched between them, inserting two bolts into predrilled holes, threading a nut onto each bolt, and tightening each bolt with a pneumatic wrench. In a preliminary study, the manager observed one of his workers performing this task five times. The observations were made in an air-conditioned, well-lit training facility, at ground level, with all tools and equipment clean and readily available.


Observation: 1 2 3 4 5
Task time (seconds): 50 54 60 66 56

a. What is the average observed time for this task?

b. What is the normal time for this task if the employee worked at a 10% slower pace than is typical for adequately trained workers?

c. What is standard time for this task if allowances sum to 14%?