Question

A time study was made of a job to develop new time standards. A worker was observed for 30 minutes. During that time, 40 units were produced. The analyst rated the worker as performing at a 120 percent performance rate. Allowances for rest and personal time are 20 percent. What is the standard time for this task?
A. 0.75 minutes
B. 0.98 minutes
C. 1.00 minutes
D. 1.08 minutes
E. 1.33 minutes

Answer

This answer is hidden. It contains 1 characters.