Question

An x-bar control chart was examined and no data points fell outside of the limits. Can this process be considered in control?

A) Not yet, there could be a pattern to the points.

B) Not yet, the R-chart must be checked.

C) Not yet, the number of samples must be known.

D) Yes.

E) Both A and B

Answer

This answer is hidden. It contains 19 characters.