Question

Estimates of construction costs for monumental Mesoamerican buildings:
A. indicate that an enormous workforce would have been needed to complete the large structures
B. take into consideration the fact that almost all buildings were constructed in one episode over a short time span
C. have to factor in the fact that most building materials came from long distances
D. reveal that fairly simple technology and a modest workforce could accomplish the task