Question

In an MRP master schedule, the planning horizon is often separated into a series of time periods called:

A. pegging.

B. lead times.

C. stacked lead times.

D. time buckets.

E. firm, fixed, and frozen.

Answer

This answer is hidden. It contains 35 characters.