Question

In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20% of the demand during lead time, the container size is 5 and the lead time to replenish an order is 5 hours, what is the number of Kanban card sets needed?
A. 5
B. 20
C. 27
D. 30
E. 34

Answer

This answer is hidden. It contains 1 characters.