Question


(p. 413) When implementing a lean production system a stabilized schedule is achieved using which of the following?

A. Level scheduling

B. Demand pull

C. Freeze window

D. Reduced lot sizes

E. Bottom-round management

Answer

This answer is hidden. It contains 157 characters.