Question

Production data for Streaks is shown. Using linear programming, the maximum number of soccer shoes that the plant can make is 250.
Monthly Product

Running Soccer Capacity (Hours)
Design 5 3 750
Manufacture 1.5 1.5 400
Profit per unit $20 $16

Answer

This answer is hidden. It contains 180 characters.