Question

Station Task Time (minutes) Time left (minutes) Ready tasks
1 A 4 11.7 C(3),B(3)
C 1.5 10.2 B(3)
B 3.2 7. D(2)
D 2.8 4.2 E(1)
2 E 17.1 0. F(0)
3 F 12.8 4.3
Summary Statistics
Cycle time 17.1 minutes
Time allocated (cycle time * #) 51.3 minutes/cycle
Time needed (sum of task times) 42.8 minutes/unit
Idle time (allocated-needed) 8.500004 minutes/cycle
Efficiency (needed/allocated) 83.43079%
Balance Delay (1-efficiency) 16.56921%
Min (theoretical) # of stations 2

12) A firm is planning to set up an assembly line to assemble 40 units per hour, and 57 minutes per hour are productive. The time to perform each task and the tasks which precede each task are:

Answer