Question

The deliverables from the coding, testing, and installation processes include:
A) the creation of a document that will consolidate the information that must be considered when implementing a physically distributed systems design.
B) structured descriptions and diagrams that outline the logic contained within each DFD process.
C) the code, program documentation, test scenarios and test data, results of program and system testing, user guides, user training plan, and an installation and conversion plan.
D) a database prototype.
E) the creation of an analysis plan.

Answer

This answer is hidden. It contains 1 characters.