Question

The main process change that can be detected with a process control chart is:

A) the process average has shifted up or down from normal.

B) the process average is trending up or down from normal.

C) the process is behaving in such a manner that the existing variation is not random in nature.

D) All of the above

Answer

This answer is hidden. It contains 10 characters.