Question

The prospective fault current for an installation is to be measured at the origin of a polyphase installation, the highest measured value is likely to be between

(A) L1 - E

(B) L1 - N

(C) L3 - N

(D) L1 - L2

Answer

This answer is hidden. It contains 8 characters.