Question

Which of the following correctly describes the predetermined manufacturing overhead rate?

A) The rate for factory utilities costs

B) The rate of actual overhead costs per day

C) The rate used to allocate overhead to production

D) The rate of increase in factory costs

Answer

This answer is hidden. It contains 31 characters.