Question

Which of the following is not something commonly found in lean systems?

(I) Waste reduction
(II) Output match to a detailed forecast
(III) Visual controls
(IV) Quick changeovers
(V) Long production runs

A. both I and V

B. both II and V

C. both II and IV

D. both IV and V

E. both III and V

Answer

This answer is hidden. It contains 81 characters.