Which of the following statements is CORRECT? Assume that the project being considered has normal cash flows, with one outflow followed by a series of inflows.

a. A projects NPV is generally found by compounding the cash inflows at the WACC to find the terminal value (TV), then discounting the TV at the IRR to find its PV.

b. The higher the WACC used to calculate the NPV, the lower the calculated NPV will be.

c. If a projects NPV is greater than zero, then its IRR must be less than the WACC.

d. If a projects NPV is greater than zero, then its IRR must be less than zero.

e. The NPVs of relatively risky projects should be found using relatively low WACCs.