Question

Which of the following statements regarding PERT times is true?

A) The optimistic time estimate is an estimate of the minimum time an activity will require.

B) The optimistic time estimate is an estimate of the maximum time an activity will require.

C) The expected time estimate is calculated as t = (a + 4m + b).

D) The pessimistic time estimate is an estimate of the minimum time an activity will require.

E) The most likely time estimate is an estimate of the maximum time an activity will require.

Answer

This answer is hidden. It contains 23 characters.