Which of the following statements regarding PERT times is true?

A) The expected time is an estimate of the time an activity will require if everything goes as planned.

B) The optimistic time estimate is an estimate of the maximum time an activity will require.

C) The expected time estimate is calculated as t = (a + 4m + b)/6.

D) The pessimistic time estimate is an estimate of the minimum time an activity will require.

E) The most likely time estimate is an estimate of the maximum time an activity will require.